Dam rehabilitation of the Reservoir of Rakaca
01.03.2013
- 30.11.2016
The dam stability of Rakaca reservoir is deficient at certain places. This problem is aggravated by a drainage system which is not well-functioning. The project partly renews the unstable part of the dam and rehabilitates the drainage system. This reduces the risk of a dam failure with related flood waves for the 5’200 inhabitants of down-stream settlements. Furthermore, supply of drinking water is ensured in the long run for 35’000 inhabitants of the region.
Projet terminé
Flood-control reconstruction of Lázbérc
01.03.2013
- 20.03.2017
During the very intense precipitations of May 2010, important structural elements of the Lázbérc reservoir were damaged due to the high run-off. The project renews and rehabilitates the damaged parts of the dam, such as the spillway, surface and underground drainage systems and the downstream canal. Thanks to this, 2’650 inhabitants of down-stream settlements are less threatened by a dam failure.
Projet terminé
Flood protection with mobile dams
01.10.2012
- 31.12.2016
Upper Tisza River Region is frequently and heavily flooded and has sudden torrents and rainfalls. In a pilot project, the National Directorate General of Disaster Management will purchase and test a mobile dike system that can serve as a rapid response, cost efficient and environmental friendly device. As this system is under certain conditions faster available than conventional flood protection with sandbags, precious time can be gained to protect the inhabitants, property and goods.
Projet terminé
Prevention and management of natural disasters in Miskolc city
01.10.2012
- 31.01.2015
Miskolc city has been hardly hit by three important flooding due to heavy rainfall in 2010, leaving behind important damages at watercourses. For this reason, this Project reconstructs and maintains two out of the city’s twelve creeks and completes the drainage system in a low-lying township. 2’700 inhabitants living in the concerned areas will thus be protected from future flooding.
Projet terminé
Se mettre au vert dans la région hongroise du Zemplén
01.09.2012
- 31.12.2016
Au nord-est de la Hongrie, dans la région montagneuse et viticole du Zemplén, les autorités et des ONG locales en coopération avec la DDC ont mis en place un vaste programme pour développer l’offre touristique et stimuler l’économie locale.
Pays/région | Thème | Période | Budget |
---|---|---|---|
Hongrie |
Non Affecté / Non Specifié
Secteur non spécifié
Favoriser la croissance économique et améliorer les conditions de travail
Développement régional et création d‘emplois
|
01.09.2012 - 31.12.2016 |
CHF 2’509’159 |
Projet terminé
Cooperation for the protection of our natural assets
01.09.2012
- 31.12.2014
In Hungary, the total area protected either by national or EU legislation has grown to 22 % of the total territory. The project collects extensive data on protected natural areas of local interest and on Natura 2000 areas. Based on this data, the project organises an important awareness raising campaign (with information events, competitions, webpage) and enhances the protection of natural areas of local interest.
Projet terminé
Widening Green Kindergarten and Ecoschool movements
01.07.2012
- 31.12.2016
In Hungary only 12 percent of the public educational institutions have the Green Kindergarten / Ecoschool Award. The project supports further educational institutions to get this award. These newly awarded Green Kindergarten and Ecoschools will teach environmental subjects of a high quality and in a systematic way to the children. Hence, the environmental consciousness of chil-dren attending these institutions is increased.
Projet terminé
Pilot general practitioner teams in North-East Hungary
01.07.2012
- 31.05.2017
Health status in Hungary is clearly below EU average, especially among marginalized groups. In a pilot programme, newly set-up general practitioner teams will provide a broader scope and better quality of health services in disadvantaged Hungarian regions. Together with accompanying research, the results of this pilot programme will serve as basis for a country-wide introduction of this model.
Projet terminé
Community Policing
01.06.2012
- 30.11.2015
To better solve today’s security problems, the police needs to increasingly cooperate with other public and private organizations such as NGOs. This pilot project introduces the concept of community policing in four Hungarian cities to lay the foundation of a country-wide implementation. Goal is to improve the security situation by bringing the police closer to the population.
Projet terminé
Surveys of protected species in Vas, Zala and Somogy
01.05.2012
- 31.12.2016
When the Natura 2000 sites in the counties Vas, Zala and Somogy were designated, several species have not been surveyed at all or just incompletely. This project fills this gap by surveying 90 data-deficient species (amphibians, reptiles, bats, butterflies, dragonflies, xilophag insects). Based on this data, protection measures are proposed which will contribute to the conservation of the Natura 2000 sites.
Projet terminé
Sustainable conservation on Hungarian Natura 2000 sites
01.04.2012
- 31.10.2016
Countrywide surveys and assessments of data-deficient forest and wetland species and habitats deliver lacking data necessary to decide on corrective measures. Based on the data, management plans for Natura 2000 areas are elaborated in close cooperation with all stakeholders as farmers or the forest industry. The plans contain corrective measures and will contribute to preserve the areas combining the interests of environment and economy.
Projet terminé
Sky-high schoolroom
01.04.2012
- 31.12.2016
Forest educational institutions are a perfect means for developing environmental consciousness of future generations. The project supports educational institutions in participating in such programs which familiarize children with protected areas such as Natura 2000. Thanks to the project, at least 12’600 children shall have the possibility to participate in such a program.