Wastewater Collection and Treatment in Zenica


The project, co-financed with the German Development Bank (Kreditanstalt für Wiederaufbau, KfW) entails the construction of a wastewater treatment plant (WWTP) and necessary measures for the municipal wastewater network. Additionally, activities for Corporate Development of the public utility and minor urban development measures are planned.

Country/region Period Budget
Bosnia and Herzegovina
01.12.2017 - 30.06.2025
CHF  5’610’000
Background

Today, still only 31% of population of Bosnia and Herzegovina have access to wastewater services, but at present 12 WWTP are in preparation or under construction in the country. In the city of Zenica, at the moment, approximately 75% of the urban population are already connected to the central sewage network. However, the municipal wastewater is discharged into the river Bosna without treatment and is additionally mixed with the industrial wastewater. The discharge of untreated urban wastewater leads to a considerable pollution of the river and health risks for the population.

Objectives

The overall objective (impact) of this project is the protection of the environment, specifically of the Bosna river and the improvement of the living conditions of the population of Zenica as well as the downstream localities in Bosnia Herzegovina. Accorrdingly, the goal is to introduce reliable and sustainable wastewater services for the population in Zenica.

Medium-term outcomes

To establish the collection, transmission and treatment of municipal wastewater of the City of Zenica in an environmentally sound and hygienic manner at affordable costs

The public utility shall run in an economically sustainable way within a functioning and adequate institutional and regulatory framework

To contribute to the sustainable and green urban development within the City of Zenica

Results

Expected results:  

Sewerage network and main collectors are rehabilitated and/or extended

The waste water treatment plant is constructed and is put in operation

The sewerage infrastructure is operated and maintained sustainably

New bike lanes (or similar urban development measures) are constructed


Directorate/federal office responsible SECO
Credit area Development cooperation
Budget Current phase Swiss budget CHF    5’610’000 Swiss disbursement to date CHF    0 Budget inclusive project partner CHF    20’601’000
Project phases Phase 1 01.12.2017 - 30.06.2025   (Current phase)