Projects

Filter results by
Status    

Object 25 – 36 of 45

Project completed
Project completed

Water Programme Aswan, Component 3: Water Efficiency and Economic Support (WEE) in Nasr El Nuba and Kom Ombo

01.07.2012 - 31.03.2018

Egypt is a water scarce country and despite recent reforms in the water sector, major challenges remain. Based on needs identified by local authorities and past experiences by the Egyptian-Swiss Development Fund, the programme aims to improve public water supply and management, increase management and income from rehabilitated irrigation systems as well as sensitizing the population about water-related issues.


Project completed

The Carter Center: International Election Assessment for Presidential Elections and Constitutional Referendum 2012

01.05.2012 - 31.12.2012

The Carter Center (TCC) will carry out analytical work on the electoral process during the presidential elections in Egypt from May to June 2012 and during the constitutional referendum, planned for autumn 2012. TCC is accredited to witness the elections process although some limitations have been made to their ability to report during the proceedings. As TCC enjoys both the confidence of the transitional authorities and a broad acceptance in the Middle East, this provides an opportunity for a firsthand insight into the electoral process as well as a building block for future interventions of both SDC and DHS (former PD IV) in the field of democratization in Egypt. There is a consensus among donors to support the initiative and hence to address the issue with a coordinated approach. The project will cover: 1. The deployment of international election experts/observers to Egypt; 2. A qualitative and quantitative data collection on key aspects of the electoral processes including reports; 3. Recommendation to improve future electoral processes.


Project completed
Project completed
Project completed
Project completed

Hayenna: Integrated Urban Development Project in Egypt

30.06.2017 - 30.06.2022

This project should enhance the organizational capacity of local government units to better manage their land and linked local revenues. Furthermore, the project activities shall also support ongoing efforts aimed at improving the related legal and institutional frameworks at the national level. This project will be implemented by UN-Habitat.


Multi-Country Investment Climate Program

01.01.2017 - 31.12.2024

The Multi-Country Investment Climate Program (MCICP) supports investment climate reform advisory in a total of 20 SECO partner countries. It is implemented by the International Finance Corporation (IFC), a globally recognized leader in this field.


World Bank Capital Markets Strenghtening Facility

01.03.2015 - 31.12.2019

The Capital Markets Strengthening Facility is an innovative cross-cutting initiative with the overall objective to develop stable and resilient capital markets and to facilitate long-term local currency financing for sectors critical for economic growth and poverty reduction. SECO’s funds are earmarked to its priority countries in the 'South'.


Improving Healthcare Hazardous Waste Management in Dakhaleya Governorate, Egypt

01.01.2015 - 31.12.2019

The Healthcare Hazardous Waste Management Project will realize one important aspect of the Egyptian National Strategy for Hazardous Medical Waste Management: the establishment of centralized incineration facilities including the required capacity building and training. The experience made with the project shall be fed back into the future discussion to revise and upgrade the strategy and into a policy dialog to improve health care waste management in Egypt.


Project completed

Public Private Infrastructure Facility (PPIAF) Phase IV

01.12.2014 - 31.12.2017

The Public-Private Infrastructure Advisory Facility (PPIAF) is a multi-donor technical assistance facility aimed at helping developing country governments improving the quality of their infrastructure services through private sector involvement.

Object 25 – 36 of 45