Projects

Filter results by
Status    

Object 4081 – 4092 of 4110

Project completed

Modernization of Heating, Cooling and Ventilation Systems in three Regional Hospitals of the Malopolskie Voivodship

Man with solar inverters

23.12.2009 - 31.01.2015

Air pollution and emission levels in Southeastern Poland are substantially higher than in Western European countries. The Malopolskie Voivodship owns 20 health care facilities located on its territory. The three public hospitals participating in this project are the largest and due to their medical specialisation the most important ones for the region. The main aim of the project is to modernize the central heating, cooling and ventilation systems of the three hospitals, thus reducing air pollution and emission levels.


Project completed

Asbestos Removal Szczucin

Workers removing asbestos

16.12.2009 - 31.03.2017

Air quality in the Voivodship Malopolskie is seriously affected by asbestos dust emissions and asbestos fibres in the air. The projects aims to renew the roofs and remove asbestos from private and public buildings in 70 communes located within the voivodship. The project also includes transport and subsequent storage in appropriate landfills. The project thus contributes significantly to the reduction of asbestos related health risks in the region.


Project completed

Waste Management System for the Region around Lubartów

Remediated waste disposal site

15.12.2009 - 31.03.2017

In an effort to reduce environmental pollution, a conglomeration of municipal authorities in Lubartów intends to establish a new waste management system for the subregion’s 81'000 inhabitants. At present, there is no sorting of ordinary and hazardous waste; waste disposal sites are inadequate; and large amounts of waste are illegally disposed of. These shortcomings have a negative impact on the environment and can lead to health problems.


Project completed

Industrial Energy Efficiency

31.10.2009 - 30.06.2017

The project is a collaboration between the UNIDO, the Departments of Trade and Industry (DTI) and of Energy (DoE) financed by SECO and DFID (UK). The project aims at a shift in industrial energy use practices in South Africa and possibly in the Southern African Region, with a view for industry to achieve a greater energy efficiency, in order to improve energy security and ensure continuity in power supply.


Project completed

Diesel Units for the Railway Line Malbork - Grudziadz

Billboard on the train informing about the Swiss Contribution

24.10.2009 - 31.12.2016

The main aim of the project is to improve the public passenger railway transport system between the cities of Malbork and Grudziadz (railway line Torun Wschodni – Malbork), predominantly located in the Pomorskie Voivodship, by purchasing modern rolling stock. This aim will be achieved by procuring four light rail diesel units of the latest technology, which will be operated by a private carrier on the basis of a concession agreement.


Project completed

Improving Warsaw Commuter Rail Services

Illustration of the planned inside of a train

24.10.2009 - 28.02.2017

The city of Warsaw is growing at a rapid pace. The need for maintenance, improvement and development of the public transport system in the city and the wider metropolitan area is apparent. This project aims at improving the efficiency, reliability, safety and comfort of passenger transport services on an important commuter railway line linking the city of Grodzisk Mazowiecki to the Warsaw city center.


Project completed

Transport Center in Legionowo

Parking garage in construction

22.10.2009 - 31.03.2017

Legionowo is a fast growing city of more than 50'000 inhabitants, located some 20 km to the north of Poland’s capital Warsaw. Today, different public transport modes (national, regional, local buses, trains) do not exploit their full potential. One of the key reasons is the lack of a proper transportation hub with adequate passenger services. However, the potential of public transport is huge. The aim of the project is therefore to build an integrated rail and bus station (Transport Center Legionowo), fully equipped with an electronic passenger information system, and with Park & Ride Facility.


Project completed

Pisco water supply rehabilitation project

01.10.2009 - 31.07.2016

Switzerland supports in partnership with the German Development Bank KfW the restoration of the water supply system in the Peruvian cities of Pisco and San Andrés.


Project completed

Financial Reporting Technical Assistance Program

02.09.2009 - 31.12.2016

Despite major reforms by the New EU Member States to their legal and regulatory frameworks governing corporate sector accounting and auditing, there is a substantial unfinished institutional development agenda in the field of financial reporting. The Financial Reporting Technical Assistance Program provides support to five national administrations (in Poland as well as in the Czech Republic, Estonia, Latvia, Slovenia) which face capacity constraints and challenges in fully implementing, both in law and in practice, the very demanding obligations imposed by the rapidly-evolving acquis communautaire in this field.


Project completed

Financial Reporting Project

01.09.2009 - 13.06.2017

Despite major reforms by the New EU Member States to their legal and regulatory frameworks governing corporate sector accounting and auditing, there is a substantial unfinished institutional development agenda in the field of financial reporting. The Financial Reporting Technical Assistance Program provides support to five national administrations (in Latvia as well as in the Czech Republic, Estonia, Poland, Slovenia) which face capacity constraints and challenges in fully implementing – both in law and in practice – the very demanding obligations imposed by the rapidly-evolving acquis communautaire in this field.


Project completed

Osh/Jalalabad Water Rehabilitation Project

01.09.2009 - 31.12.2018

The basic objectives are to restore an uninterrupted supply of quality water to 260'000 people in Osh and 75'000 people in Jalal-Abad as well as to strengthen the capacity of the publicly owned water companies in technical, organizational and financial aspects. The project is co-financed with the European Bank for Reconstruction and Development.


Project completed

Swiss IMF Technical Assistance Subaccount, LoU East

01.08.2009 - 31.12.2015

Under the Letter of Understanding (LoU) East, the State Secretariat for Economic Affairs (SECO) is financing through a dedicated Trust Fund ('the Subaccount') Technical Assistance (TA) implemented by the International Monetary Fund (IMF) in Southeastern Europe and Central Asia.

Object 4081 – 4092 of 4110