Cyclone Mocha Relief 2023
The present credit proposal funds UNHCR, IOM, HEKS and Helvetas in line with the JRP and Flash Appeal to ‘build back better’ by rebuilding, repairing and reconstructing essential camp infrastructure (shelter) to assist the population who have suffered through the destruction of the Cyclone Mocha in Rohingya refugee camps and Host community in Cox’s Bazar, Bangladesh. The project is relevant for Switzerland as it supports in saving lives and alleviate sufferings through the reduction of vulnerability of the Rohingya refugees and promote humanitarian principles.
| Country/region | Topic | Period | Budget |
|---|---|---|---|
|
Bangladesh |
Emergency Relief and Protection Other
Emergency rehabilitation
Sector not specified |
15.06.2023
- 15.11.2023 |
CHF 800’000
|
- Swiss Interchurch Aid
- HELVETAS Swiss Intercooperation
- Office of the UN High Commissioner for Refugees
- UNHCR, IOM, HEKS and Helvetas
- Site Management and Site Development Sector
- SDC projects in Cox’s Bazar
- SDC-UNHCR Secondment
-
Sector according to the OECD Developement Assistance Commitiee categorisation EMERGENCY RESPONSE
Unallocated / Unspecified
Unallocated / Unspecified
Sub-Sector according to the OECD Developement Assistance Commitiee categorisation Material relief assistance and services
Sectors not specified
Sectors not specified
Cross-cutting topics The project promotes biodiversity.
Aid Type Project and programme contribution
Project number 7F11206
| Background |
Following the outbreak of violence in Myanmar's Rakhine State in 2017, more than 740,000 people initially fled to seek refuge in Cox’s Bazar District of Bangladesh. The conditions in the refugee and makeshift camps, which are mainly located in the vicinity of the south-eastern coastal town of Cox's Bazar, are extremely difficult. The humanitarian needs are enormous and people are entirely reliant on humanitarian assistance regarding shelter, basic services, food, water, and protection. The already challenging conditions were further exacerbated by fires in early 2023 where reconstruction was not completed prior to Cyclone Mocha. On 14 May 2023, Cyclone Mocha struck the coastal areas near the Bangladesh-Myanmar border. The heavy rains and strong winds led to landslides, as well as damage and destruction to homes and facilities in all 33 Rohingya refugee camps in Cox’s Bazar and neighbouring Bangladeshi communities. While the eye of the Cyclone missed Bangladesh, close to 40,000 Rohingya refugees had their shelters - made of bamboo and tarpaulin - damaged or destroyed. In total, 8,063 shelters were damaged across the 33 camps. As such, there is an urgent need to reinforce preparedness capacity ahead of the monsoon season, as well as to build back better with weather and fire-resistant materials that is so critical in saving lives. |
| Objectives | The overall objective is to provide emergency life saving assistance for the Rohingya refugees in Bangladesh affected by the cyclone Mocha. |
| Target groups | A minimum of 15,000 Cyclone Mocha affected beneficiaries in both host and Rohingya communities. |
| Medium-term outcomes |
Outcome 1: Provide safe and dignified living conditions to reduce suffering and increase resilience and provide life-saving emergency Shelter / Non-Food Items support to households affected by the cyclone Mocha and other shocks for refugees and the host community living adjacent to camps. Outcome 2: Simulation on Cyclone Preparedness and Monsoon. |
| Results |
Expected results: Output 1: Rehabilitation and reinforcement of refugee shelters using weather- and fire-resistant materials. Output 2: Organize the cyclone simulation in the targeted camps and host community with the support of the Ministry of Disaster Management and Relief (MoDMR) to raise awareness on cyclones preparedness. |
| Directorate/federal office responsible |
SDC |
| Project partners |
Contract partner Swiss Non-profit Organisation United Nations Organization (UNO) |
| Coordination with other projects and actors |
|
| Budget | Current phase Swiss budget CHF 800’000 Swiss disbursement to date CHF 728’426 |
| Project phases |
Phase 1 15.06.2023 - 15.11.2023 (Completed) |