Pamir Private Power Project II
In July 2011 the Swiss State Secretariat for Economic Affairs SECO approved the financing of a Phase II project comprising a more targeted lifeline subsidy scheme benefitting the poor (2012 - 2014) and the early completion of the ongoing metering programme (pre-requisite for the efficient and equitable operation of such a subsidy scheme).
| Región/País | Tema | Período | Presupuesto |
|---|---|---|---|
|
Tayikistán |
Climate-friendly growth |
01.03.2011
- 31.12.2021 |
CHF 5'379'122
|
- International Development Agency
-
Sector según clasificación del comité de ayuda al desarrollo de la OCDE ENERGÍA
Sub-Sector según clasificación del comité de ayuda al desarrollo de la OCDE Electric power transmission and distribution (centralised grids)
Temas transversales El proyecto tiene en cuenta la democratización, la buena gobernanza y los derechos humanos como tema transversal.
El proyecto tiene en cuenta el medio ambiente como tema transversal.
Número de proyecto UR00040
| Contexto |
On July 16, 2015, mudflows triggered by glacial melt amid abnormally hot weather destroyed 75 houses in the villages of Barsem and Kholkhozobod in the Shugnan district of GBAO, damaged road infrastructure and interrupted power transmission from the Pamir 1 Hydro-power Plant (HPP) to Khorog city and its surroundings. Two 35kV transmission lines and one 10 kV distribution line have been damaged. As a consequence, over 74% of population in GBAO had been without electricity for several days. Barsem and Kholkhozobod?s population have been evacuated to a temporary camp. ted transmission line and ener-gy transmission was restored with partial capacity (40% of Pamir 1 HPP?s 28 MW). These provisional measures can only be a short-term remedy due to two reasons: ? The capacity of the provisionally erected transmission lines are not sufficient to ensure electricity supply during the winter. Khorog and the surrounding villages rely on electric heating in winter during which temperatures may fall to -50C. ? The provisionally erected transmission lines stand on land which is highly likely to be affected by avalanches during winter. SECO decided to make available USD 625,000 as Early Recovery assistance, including the rehabilitation of the power line between Khorog and Khorog HPP as well as strengthening PE's capacity in DRR. |
| Objetivos |
Restore power transmission between Pamir I HPP and Khorog before onset of winter 2015. Increase DRR-capacity of Pamir Energy. |
| Efectos a medio plazo |
Energy transmission between Pamir I HPP and Khorog city restored. Pamir Energy better able to reduce risks linked to natural disasters and respond to them effectively when they occur. |
| Resultados |
Resultados previstos: Transmission line between Khorog and Pamir I HPP built. |
| Dirección / Officina Federal responsable |
SECO |
| Crédito |
Cooperación al desarrollo |
| Contrapartes del proyecto |
Contraparte del contrato |
| Presupuesto | Fase en curso Presupuesto suizo CHF 5'379'122 Presupuesto actual suizo ya emitido CHF 0 Presupuesto inclusive contrapartes del proyecto CHF 35'500'000 |
| Fases del proyecto | Fase 3 01.06.2019 - 31.12.2024 (Fase en curso) Fase 2 01.03.2011 - 31.12.2021 (Fase en curso) |