France: SET Forest Fires, July 2026
Due to the devastating forest fires in several parts of France and resulting needs for international response the French authorities submitted a demand to Switzerland for assistance. Based on the agreement between SDC/H and the Swiss Armed Forces (ADRIANA) a joint deployment (SDC/Swiss Armed Forces) with two Superpuma helicopters (Swiss Air Force) and respective staff members is planned to support the French responders to limit damage of nature and infrastructure by dropping water on the burning areas and in particular to protect and support the affected population. A similar deployment took place in August 2021 in Greece.
| Pays/région | Thème | Période | Budget |
|---|---|---|---|
|
France |
Aide d'urgence et protection
Réhabilitation d'urgence
|
27.07.2026
- 31.08.2026 |
CHF 30’000
|
- Le Corps suisse d’aide humanitaire
-
Secteur selon catégorisation du Comité d'aide au développement de l'OCDE INTERVENTION D'URGENCE
Sous-Secteur selon catégorisation du Comité d'aide au développement de l'OCDE Assistance matérielle et services d’urgence
Type d'aide Mise en œuvre directe par la DDC
Numéro de projet 7F11794
| Contexte | Regions in France, affected by the forest fires, most likely with focus on Center region of Corsica. |
| Objectifs | Contribution to protect the population, nature and infrastructure in the areas affected by the forest fires |
| Groupes cibles |
Directly: France disaster responders/authorities Indirectly: Population in France affected by the forest fires, having lost or at risk of losing arable land, livelihood or infrastructure and lives. |
| Effets à moyen terme | French disaster response authorities are supported in fighting the forest fires |
| Résultats |
Principaux résultats attendus: Extinguishing individual sources of forest fire by dropping water from two Superpuma helicopters of the Swiss Army / Air Force Principaux résultats antérieurs: n/a |
| Direction/office fédéral responsable |
DDC |
| Partenaire de projet |
Partenaire contractuel |
| Coordination avec d'autres projets et acteurs | n/a |
| Budget | Phase en cours Budget de la Suisse CHF 30’000 Budget suisse déjà attribué CHF 27’142 Projet total depuis la première phase Budget de la Suisse CHF 0 Budget y compris partenaires de projet CHF 30’000 |
| Phases du projet |
Phase 1 27.07.2026 - 31.08.2026 (Active) |