Oggetto 13 – 24 di 330

Progetto concluso

Cluj-Napoca rehabilitation of public buildings

27.08.2015 - 27.07.2019

The objectives of the project are the thermal and electric rehabilitation of four buildings in the two public schools in the city of Cluj-Napoca (George Cosbuc National College and Sigismund Toduta music high school). Besides the improvement of energy efficiency and cost savings, the project will also contribute to improved working conditions of students and put the buildings in line with sanitary requirements for public schools.


Progetto concluso

Suceava electromobility

Un uomo noleggia una bicicletta elettrica.

30.07.2015 - 07.09.2019

This project aims at promoting electromobility in the city of Suceava and throughout Romania. The supply of different types of e-vehicles and the construction of a dense and future-oriented network of charging stations are promoting this technology. The effects of the projects are a reduced consumption of energy resulting in a decreased emission of climate-effecting gases. Furthermore, an example for the use of electric vehicles as a way towards a more sustainable and green mobility is to be made.


Progetto concluso

Cluj-Napoca electric buses

Autobus elettrici

29.07.2015 - 29.10.2018

In order to promote clean urban transport and innovative, sustainable public transport, reduce energy consumption and improve air quality, old diesel buses of Cluj-Napoca were replaced by battery powered autonomous electric buses, which will complement existing public transportation systems, such as trolleybuses and trams.


Progetto concluso

Brasov rehabilitation of public buildings

Edificio scolastico ristrutturato

23.07.2015 - 23.05.2019

The objective of the project is the thermal and electric refurbishment of two public schools in the city of Brasov (Grigore Moisil Information Technology College and a primary school with kindergarten, named Grammar School No 4). Besides the improvement of energy efficiency and cost savings, the proposed measures will also result in improved working conditions of students and pupils. Additionally, the buildings standards will be in line with the Romanian sanitary requirements for public schools.


Progetto concluso

Arad rehabilitation of district heating

16.07.2015 - 18.11.2018

The activities of this project are twofold. Parts of the thermal transport network in Arad are rehabilitated. Moreover, an existing thermal substation in Aradul Nou, a residential area in Arad, is converted into a new heat boiler station. Besides the improvement of comfort to its citizens, as well as the reduction of CO2 emissions and consequent improvement of the environment, the municipal district heating rehabilitation programme is also intended to improve the finances of the Municipality of Arad.


Progetto concluso

Cluj-Napoca public lighting with LED

09.07.2015 - 09.08.2019

In order to improve road safety and save energy, a part of Cluj-Napoca’s street lighting system is being modernized and equipped with modern LED lamps and a telemanagement system. In addition, the indoor lighting system of public buildings will be replaced by modern LED technology.


Progetto concluso

Brasov rehabilitation of district heating system

Costruttore in escavatore

25.06.2015 - 07.09.2019

In the framework of this project, the old, worn-out and over-dimensioned tubes of the heat transport and distribution networks of district heating system of Tractorul, a residential area of the city of Brasov, will be replaced.


Progetto concluso

Integrated Export Services for Sustainable Support of SMEs

Donna con vaso di miele

17.06.2015 - 07.09.2019

The project aims to strengthen the competitiveness and export capacities of small and medium-sized enterprises’ (SMEs), specifically in the wood and furniture industry as well as in the organic agriculture sector, by improving their export potential and their market diversification, thereby reducing economic disparities and contributing to the development of two of Romania's poorest regions. Currently, Romania has a low number of exporting SMEs and a limited number of innovative companies being involved in export. The project is full in line with Romania’s National Export Strategy (2014-2020) owing to Romania’s competitive advantages such as technical skills, good farmland, availability of raw materials and external demand. 


Progetto concluso

Arad public lighting with LED

Due pedoni su un percorso illuminato

28.05.2015 - 30.06.2019

In order to improve road safety and energy efficiency, a part of Arad’s public lighting system is modernized and extended. This includes the illumination of a bicycle road, a pedestrian boardwalk along the Mures River and 70 playgrounds around the City of Arad, as well as the modernization and extension of street lighting systems with LED lamps.


Pilot models for environmentally friendly collection and temporary storage of hazardous household waste

21.04.2015 - 07.12.2019

Despite existing policy and regulatory frameworks in the field of national waste management in Bulgaria, efficient solutions for the waste problem are not yet employed. In order to address this, law-conforming systems for environmentally friendly collection and temporary storage of hazardous household waste (HHW) shall be established in a pilot project covering 22 pilot municipalities.


Environmentally sound disposal of obsolete pesticides

Worker with pesticides

21.04.2015 - 07.12.2019

The project aims to support Bulgaria in the environmentally friendly disposal of several thousand tons of dangerous obsolete chemicals from the days of Communist rule and thereby removes a serious threat to public health and environment.


Progetto concluso

Suceava public lighting with LED

02.04.2015 - 07.09.2019

In order to improve road safety and save energy, Suceava’s street lighting system was modernized and equipped with modern LED lamps and a telemanagement system.