Banca dati progetti per l'Unione europea allargata

Ordina i risultati per
Stato    

Oggetto 49 – 60 di 330

Progetto concluso

Waste Monitoring Middle Danube Inspectorate

Due lavoratori con apparecchi di misurazione in Ungheria

20.01.2011 - 30.06.2016

The Middle Danube Valley Inspectorate for Environmental Protection, Nature Conservation and Water Management aims at improving quantitatively and qualitatively emissions control in order to protect the health of the population and the environment. Switzerland contributes CHF 5.078 mio. to this project that will diminish the risk of contamination of air, soil and water (namely ground water resources).  


Progetto concluso

Environment Expertise Fund

Pravčická brána, Svizzera ceca

01.01.2011 - 31.12.2016

The Environment Expertise Fund aims at supporting sub-projects (size: CHF 30'000 to CHF 200'000) related to (1) Enhancing planning capacities of the public administration in selected environmental areas, (2) Increasing experience and knowledge of Czech and Swiss organisations active in environmental issues and (3) Using new methods in promoting environmental protection and sustainable development. The Project will improve professional qualifications of workers employed with environmental protection and sustainable development issues and increased public awareness for these topics.


Progetto concluso

INOSTART Programme

01.01.2011 - 31.12.2016

SME financing has been identified as a priority under the Swiss-Czech Cooperation Programme. The pilot INOSTART Programme will respond to the existing gap on the Czech financial market by providing investment loans, which are backed by preferential guarantees and complemented by targeted technical assistance, to start-ups with innovative business plans. Thereby, INOSTART will increase the access to long-term finance for Czech start-up enterprises so that they can enhance their growth, innovation and ultimately their competitiveness potential.


Progetto concluso

Project Preparation Facility (PPF)

01.12.2010 - 31.12.2015

The Swiss Contribution to enlargement aims to finance a broad variety of projects. The PPF provided the necessary financial assistance to enable Executing Agencies to submit high quality project proposals. This was especially important in the case of complex projects.


Progetto concluso

Water Supply Rehabilitation Ózd

Condotte verranno

10.11.2010 - 31.12.2016

The control system for the water supply in the municipality of Ózd is antiquated. A district with 700 to 800 households are not connected to the central water supply network. Switzerland intends to change this situation by a project contribution of CHF 7.1 million. The aim is to ensure the same level of service standard in the entire municipality, to improve the water quality, and to reduce maintenance costs.


Progetto concluso

Water Supply Rehabilitation Balassagyarmat

10.11.2010 - 30.11.2016

Switzerland is contributing CHF 4.12 million to a project in Balassagyarmat to reduce maintenance costs and ensure the reliability of water supply. Water mains and household connections with the largest number of pipe bursts will be replaced. The investments will also have a positive impact on water quality.


Progetto concluso

Water Supply Rehabilitation Érd

Due operai alle prese con un tubo

10.11.2010 - 31.05.2016

Switzerland supports the rehabilitation of the main water pipelines and the introduction of a new control system and a modern pumping station in Érd with a contribution of CHF 5.821 million. This will improve the reliability of the water supply and reduce maintenance cost.


Progetto concluso

Water Supply Borsod-Abauj-Zemplen

10.11.2010 - 30.04.2017

Switzerland is contributing CHF 7.803 mio. to improve the water supply network in 11 municipalities of the subregion Borsod-Abaúd Zemplén. Additionally, a water supply network will be introduced in two settlements that are so far only partly or not at all connected to a network.


Progetto concluso

Renewable Energy across the Alpine Land

Worker in the heating room of Bled primary school

25.10.2010 - 30.09.2015

The Regional Development Agency of Gorenjska Region improved the energy efficiency in 12 public buildings and introduced renewable energy systems as a source of electricity and heating. The goal to minimize the consumption of energy in public buildings where the energy consumption costs are high could be achieved. The public buildings are used by many inhabitants of the region. Therefore the change of energy or heating source in these buildings is also useful for the promotion of renewable energy.


Progetto concluso

Healing Regions

Gruppo sportive nella foresta

01.10.2010 - 31.12.2014

As part of its enlargement contribution, Switzerland is supporting this tourism project to strengthen Destination Management Organisations (DMO) in the economic development areas of Northern Hungary and the Northern Great Plain. The project focuses on medical tourism.


Progetto concluso

Sustainable tourism (Tisza)

River Tisza

01.10.2010 - 31.01.2015

As part of its enlargement contribution, Switzerland is supporting this tourism project to strengthen Destination Management Organizations (DMO) in the economic development areas of Northern Hungary and the Northern Great Plain. The project focuses on cultural tourism.


Progetto concluso

Renewable Energy Sources in the Wisloka River Basin

01.09.2010 - 31.03.2017

Air pollution and emission levels in Southern Poland are substantially higher than in Western European countries, due to the common use of coal for heating purposes. The project aims to improve air quality by introducing renewable energy sources in the Union of the Wisloka River Basin Communes. Solar systems for hot water production will be installed on private and public buildings, and photovoltaic systems for electricity generation will be provided to selected public buildings.

Oggetto 49 – 60 di 330