China: Rehabilitation and management strategy for over-pumped aquifers under a changing climate

Projekt abgeschlossen

In the past 30 years the aquifers in the North China plain have been over-exploited. Based on cutting-edge Sino-Swiss expertise in real-time groundwater monitoring and modelling, the project will implement groundwater and agricultural management policies to stabilize groundwater levels as a buffer to climate change induced droughts. The project will work with farmers and local authorities to facilitate policy uptake. Findings are relevant for many water-stressed countries and will be shared globally.

Land/Region Thema Periode Budget
China
Wasser
Klimawandel & Umwelt
Landwirtschaft und Ernährungssicherheit
Einsparung von Wasserressourcen
Umweltpolitik
Landwirtschaftliche Wasserressourcen
01.09.2018 - 31.12.2022
CHF  2’816’000
Hintergrund

Severe over-pumping of aquifers has become a common problem in many arid- or semi-arid regions of the world. In the North China Plains, where 30% of China’s grain is produced, water tables have dropped at a speed of 2 meters per year. Over-pumping aquifers causes ecological and environmental degradation of soils, wetlands and rivers and it also increases the pumping cost for farmers due to the declining groundwater table. And it reduces the ability of aquifers to serve as a buffer for increasing climate extremes, induced by climate change.

Sustainable management of groundwater is a global concern. 40% of the global irrigation water comes from groundwater. Experiences from this project are highly relevant at the local, regional and global level.

Ziele The overall goal of the project is to test and implement groundwater management and water saving policies in order to strengthen adaptation capacity to climate variability and climate change.
Zielgruppen
  1. Farmers and water user associations, who suffer from the declining groundwater levels, are the main stakeholders to sustain groundwater levels by their individual and collective actions;
  2.  Research and policy advisory institutes and water experts as the major policy advising group in and outside China will benefit from evidence-based policy testing
  3.  Local and National authorities and line ministries, will benefit from cross-sectoral
Mittelfristige Wirkungen

Outcome 1: Chinese capacity of establishing and maintaining real-time groundwater monitoring and control systems is assured. 

Outcome 2: Policy options for sustainable management of groundwater and water efficient agricultural practices are jointly elaborated and implemented by the local authorities 

Outcome 3: Knowledge and best practices generated are shared for replication at the national, regional and global level.

Resultate

Erwartete Resultate:  

Phase 2 of the project will complete the real-time groundwater monitoring and modelling in Guantao County to serve for real-time decision support in the pilot region. 

Strong emphasis will be on policy influencing by use of the evidence and results gained from the project. 

Strong efforts will be made in knowledge sharing and technology transfer to other places in China, as well as to South Asia (Pakistan, India) and Central Asia. The global outreach of this project will be facilitated by working with multilateral research organisations such as the International Water Management Institute and UN-organisations.


Resultate von früheren Phasen:  

The project was carried-out in 2 pilot regions in Phase 1: In the Heihe river basin in northwest of China a combined groundwater metering and water fee collection system was implemented through a public-private-partnership. Combined with a groundwater pricing system associated with quota and subsidy for water saving equipment, the system encourages farmers to save water and has already contributed to mitigation of groundwater over-exploitation. The Heihe pilot is completed and sustainably operated by the Chinese partners.

In the second pilot site, the Guantao County of Hebei province in the North China Plain the project designed a system of monitoring groundwater abstraction based on electricity consumption. This cost-efficient method successfully solved the difficulty of groundwater monitoring, and can be up-scaled to the entire North China Plain. In addition, an online data platform has been set-up to store the observation data of groundwater pumping and groundwater levels, and tools for modelling and decision-making were developed in Phase 1.


Verantwortliche Direktion/Bundesamt DEZA
Kreditbereich Entwicklungszusammenarbeit
Projektpartner Vertragspartner
Ausländische Hochschul- und Forschungsinstitution
Privatsektor
Ausländische staatliche Institution
Schweizerische Hochschul- und Forschungsinstitution
  • Beratungsgruppe für internationale Agrarforschung
  • ETHZ Zürich
  • Ausländischer Privatsektor Süden/Osten
  • Schweizerischer Privatsektor
  • Sub-National State SouthEast


Koordination mit anderen Projekten und Akteuren

The project is fully in line with China’s national strategy for groundwater governance in North China Plain, and will maximize synergies with national actions.

Synergies with other groundwater management and water efficient agriculture initiatives will be established, e.g. with a new project on Solar pumping and groundwater governance of GPCCE India, and with projects of GPW and GPFS.

Budget Laufende Phase Schweizer Beitrag CHF    2’816’000 Bereits ausgegebenes Schweizer Budget CHF    2’396’448
Projektphasen

Phase 2 01.09.2018 - 31.12.2022   (Completed)

Phase 1 15.03.2014 - 31.07.2018   (Completed)