Integrated Project for Social Inclusion of Roma and Other Vulnerable Groups in the municipalities of Burgas, Sredets and Malko Tarnovo

Proyecto terminado

The goal of the project “Integrated Approach for Inclusion of Roma and other vulnerable Groups in Burgas Municipality" is to support the Bulgarian Government to implement the National Strategy for the Integration of Roma in Bulgaria (2012-2020) which aims at improving their living conditions through better access to services and rights for the Roma community and at empowering Roma through strengthened cultural integration and identity, improved acceptance and enhanced Roma participation in decision making/policy institutions.

Región/País Tema Período Presupuesto
Bulgaria
Mejorar la seguridad social
01.07.2015 - 30.04.2019
CHF  1’299’990

Note: the texts under all the headings, with the exception of 'Results achieved', describe the situation before the start of the project.

Contexto

Burgas District - the municipalities of Burgas, Sredets and Malko Tarnovo - fall into the Southeastern region of planning with Burgas as a district center. According to 2011 census, the population is 370 544 people, of whom 18 424 identify themselves as Roma. The main problems are i) lack of childcare facilities such as kindergarten and schools, ii) low academic achievements of students from І to ІV grade and drop-out of students from the education system, iii) inability of students to continue their education after the 8th grade iv) a part of the Roma population is not insured or have cancelled their health insurance , v) those who are covered by the health insurance (children 0-18 and pensioners), are not registered with a GP and vi) most of the diseases are the result of bad hygienic living conditions and poverty, which cause various infectious diseases.

Objetivos

 

  • Improvement of the living conditions by providing easier access to the Roma community and other vulnerable groups from Burgas, Sredets and Malko Tarnovo to services and human rights and strengthening of their cultural identity
  • Creation of suitable conditions for sustainable integration of marginalized and socially excluded Roma and other vulnerable groups from Burgas, Sredets and Malko Tarnovo by introducing integrated services and activities, combining measures, facilitating the access to education, health and preventive measures, strengthening of the cultural identity and measures for community development

 

Grupos destinarios

Roma and other vulnerable groups

Actividades

 

  • Built childcare center and conducted overall repair of the existing buildings of kindergartens
  • Established Centre for community development in Pobeda neighbourhood in the town of Sredets
  • Groups for all-day and extracurricular education of students from 1st to 4th grade
  • Individual programmes for personal development
  • Trained teachers and education mediators
  • Information campaigns
  • Conducted prophylactic gynecological examinations

 

Resultados

Resultados obtenidos:  

  • Overall repair of the existing buidings of kindergartens
  • Over 500 parents were engaged in the Active Parents and Responsible Parents clubs
  • 4 educational mediators are operating
  • 6 education and information campaigns conducted
  • Community Center in Sredec is providing para-scholar activities for 50 children and 100 parents
  • 2500 individuals were covered by different health campaigns
  • 602 gynecological consultations were carried out

 


Dirección / Officina Federal responsable COSUDE
Crédito Contribución suiza a la ampliación de la UE
Contrapartes del proyecto Contraparte del contrato
Institución estatal extrangera


Presupuesto Fase en curso Presupuesto suizo CHF    1’299’990 Presupuesto actual suizo ya emitido CHF    261’354 Presupuesto inclusive contrapartes del proyecto CHF    1’529’400
Fases del proyecto Fase 9 01.09.2016 - 30.04.2019   (Completed) Fase 8 01.09.2016 - 30.04.2019   (Completed) Fase 7 01.04.2016 - 30.04.2019   (Completed)

Fase 6 01.07.2015 - 30.04.2019   (Completed)

Fase 5 01.07.2015 - 30.04.2019   (Completed) Fase 4 01.07.2015 - 30.04.2019   (Completed)