Wastewater Collection and Treatment in Zenica


Questa pagina non è disponibile in italiano. Selezionare una delle lingue seguenti:

The project, co-financed with the German Development Bank (Kreditanstalt für Wiederaufbau, KfW) entails the construction of a wastewater treatment plant (WWTP) and necessary measures for the municipal wastewater network. Additionally, activities for Corporate Development of the public utility and minor urban development measures are planned.

Paese/Regione Periodo Budget
Bosnia e Erzegovina
01.12.2017 - 30.06.2025
CHF  5’610’000
Contesto

Today, still only 31% of population of Bosnia and Herzegovina have access to wastewater services, but at present 12 WWTP are in preparation or under construction in the country. In the city of Zenica, at the moment, approximately 75% of the urban population are already connected to the central sewage network. However, the municipal wastewater is discharged into the river Bosna without treatment and is additionally mixed with the industrial wastewater. The discharge of untreated urban wastewater leads to a considerable pollution of the river and health risks for the population.

Obiettivi

The overall objective (impact) of this project is the protection of the environment, specifically of the Bosna river and the improvement of the living conditions of the population of Zenica as well as the downstream localities in Bosnia Herzegovina. Accorrdingly, the goal is to introduce reliable and sustainable wastewater services for the population in Zenica.

Effetti a medio termine

To establish the collection, transmission and treatment of municipal wastewater of the City of Zenica in an environmentally sound and hygienic manner at affordable costs

The public utility shall run in an economically sustainable way within a functioning and adequate institutional and regulatory framework

To contribute to the sustainable and green urban development within the City of Zenica

Risultati

Risultati principali attesi:  

Sewerage network and main collectors are rehabilitated and/or extended

The waste water treatment plant is constructed and is put in operation

The sewerage infrastructure is operated and maintained sustainably

New bike lanes (or similar urban development measures) are constructed


Direzione/Ufficio responsabile SECO
Credito Cooperazione allo sviluppo
Budget Fase in corso Budget Svizzera CHF    5’610’000 Budget svizzero attualmente già speso CHF    0 Budget inclusi partner del progetto CHF    20’601’000
Fasi del progetto Fase 1 01.12.2017 - 30.06.2025   (Fase in corso)