Large parts of the Ukrainian territory in the North of the country have been occupied by Russian Forces during several weeks and re-taken in April by the Ukrainian army and made destruction visible and accessible. The direct action will provide specific equipment and repair, as well as coordination capacities for urban and rural Vodakanals in the two oblasts of Chernihiv and Sumy.

Región/País Tema Período Presupuesto
Ucrania
Agua
nothemedefined
Abastecimiento de agua
Saneamiento de agua
Seguridad y diplomacia del agua
20.06.2022 - 31.12.2023
CHF  3’600’000
Contexto

The Russian military attack on Ukraine started on 24th of February 2022. While currently main hostilities concentrate to the Eastern areas of Ukraine, the Northern occupied territories have been largely re-taken by Ukrainian forces. As a result of hostilities and occupation until end of March, a substantial part of essential water supply and sewage infrastructure is destroyed. Shocks through detonations, shelling, and moving tanks in the streets affected in particular sewage collectors, drinking water supply networks, and other underground-infrastructure such as pumping- and lifting stations leaving hundreds of thousands of people without access to safe water supply and sewage removal in their houses.

The project area of concern is the Newly Accessible Area in Chernihiv and Sumy Oblast in North-East of Ukraine where many cities are heavily affected. The probability of a new major attack on these areas is estimated to be rather low as the major area where hostilities take place is concentrated in Eastern Ukraine.

Objetivos The overall goal of the intervention is to restore and improve the access to safe drinking water and sanitations services of the affected population.
Grupos destinarios
  • City councils / Vodakanals of Sumy and Chernihiv Oblast
  • Approximately eight war-affected municipalities in Chernihiv and Sumy Oblasts
Efectos a medio plazo
  • Urban water institutions of the two cities of Sumy and Chernihiv have improved resilience to maintain their water infrastructure
  • Existing water supply systems in small cities and villages across Sumy and Chernihiv Oblasts can rely on restored water and sanitation infrastructure
Resultados

Resultados previstos:  

  • Supply of equipment and machinery for network failure detection and reparation works to Vodakanals within Chernihiv and Sumy Oblast, including the thorough training on the modern equipment. Minor emergency reparation works can be funded through the project
  • Restoration of damaged WASH infrastructure in rural municipalities. Capacity building for the technical departments focussing on project identification, design, tendering and supervision of the execution works


Resultados de las fases anteriores:   An initial assessment of the destruction and needs took place in the beginning of May 2022 by an expert team of the Swiss Embassy HA Unit. Most important needs were identified within water and sewage networks which have been destroyed to a large extent.


Dirección / Officina Federal responsable COSUDE
Contrapartes del proyecto Contraparte del contrato
ONG internacional o extranjera
Organización suiza sin fines de lucro
  • HELVETAS Swiss Intercooperation
  • Other international or foreign NGO North
  • Cuerpo Suizo de Ayuda Humanitaria
  • City councils and Vodakanals of Chernihiv and Sumy Oblasts; Municipalities in the rural area of Chernihiv and Sumy Oblasts; DESPRO (former SDC Decentralization NGO)


Coordinación con otros proyectos y actores WASH cluster, UNICEF, ICRC
Presupuesto Fase en curso Presupuesto suizo CHF    3’600’000 Presupuesto actual suizo ya emitido CHF    3’640’382 Total del proyecto desde la primera fase Presupuesto inclusive contrapartes del proyecto CHF   3’600’000
Fases del proyecto Fase 3 15.01.2025 - 31.12.2027   (Fase en curso) Fase 2 21.06.2023 - 31.03.2025   (Completed)