China: Groundwater Rehabilitation under a changing climate

Projet terminé

In the past 30 years the aquifers in the semi-arid North China Plain have been greatly overexploited. Climate change is increasing the drought problem. The project assesses measures to establish a long-term balanced regional water budget by water imports and water saving and applies complementary use of precipitation, surface water and groundwater. The system is based on real-time monitoring of groundwater tables and pumping rates and controlling pumping wells via a quota system. The insights of this project can be applied also in other countries.

Pays/région Thème Période Budget
Chine
Eau
Changement climatique & environnement
Conservation des ressources en eau
Politique du secteur de l’eau
Politique de l’environnement
15.03.2014 - 31.07.2018
CHF  6’057’740
Contexte

In arid and semi-arid regions, reliable agricultural production is only feasible with irrigation. Groundwater, being the only water resource available all year round, is more and more under stress. Only under strict management, aquifers will be able to relieve droughts reliably. China severely suffers from this problem. Additionally, droughts and heat waves increased by climate change, impact on the availability of water. In order to guarantee the availability of water, particularly for food security, a groundwater management system must be established.

Objectifs

To strengthen the adaptation capacity to climate change  by supporting better groundwater management through real-time monitoring, modeling and controlling in areas under water stress.

Groupes cibles
  • Poor farmers in the project pilot region, who have to pay more for groundwater pumping with increasing drawdown and whose income will suffer from climate variability.
  • Local water user associations and water authorities, whose water management work will be made more efficient with better management tools.
  • National research and policy advising institutes.
Effets à moyen terme
  • Outcome 1 Providing the data and information base for real-time water allocation.
  • Outcome 2 Developing and implementing an integrated real-time monitoring, modeling and controlling system to prevent groundwater depletion and build up adaptation capacity to climate change.
  • Outcome 3 Policy options are elaborated through dialogues with the stakeholders and implemented by the local authorities.
  • Outcome 4 Improved knowledge of using real-time monitoring, modeling and controlling system to prevent groundwater depletion for arid regions in developing countries.
Résultats

Principaux résultats antérieurs:  

  • The project structure has been set up with national and sub-national stakeholders.
  • Project areas have been delineated.
  • Data collection, base model set up, initial assessment of the current infrastructure and monitoring system, design of data base and data platform.


Direction/office fédéral responsable DDC
Crédit Coopération au développement
Partenaire de projet Partenaire contractuel
Secteur privé
Institution étatique étrangère
Institution universitaire et de recherche suisse
  • ETHZ Zurich
  • National State Institute North
  • Secteur privé suisse
  • Sub-National State SouthEast


Budget Phase en cours Budget de la Suisse CHF    6’057’740 Budget suisse déjà attribué CHF    6’022’636 Projet total depuis la première phase Budget y compris partenaires de projet CHF   7’970’000
Phases du projet Phase 2 01.09.2018 - 31.12.2022   (Completed)

Phase 1 15.03.2014 - 31.07.2018   (Completed)