Kocani Waste Water Treatment Project

Projekt abgeschlossen

The project will finance the building of a waste water treatment plant in the city of Kocani. It will improve the water quality of one of the main rivers in the country. The project contributes to the sustainable development of the Kocani region through protection of the natural resources. This will promote the economic development of the region.

Land/Region Periode Budget
Nordmazedonien
01.09.2013 - 31.12.2021
CHF  23’375’000
Hintergrund

Macedonia includes three main hydro graphic catchment areas: the Vardar river, the Crni Drim and the Strumica area. The Bregalnica Rriver Basin is part of the Vardar river catchment area, comprising twelve municipalities with a total population of over 200?000 people. The river drains an area of 4?300 km2, and has an important function as drainage for wastewater and as water source for irrigation. In Berovo, SECO financed the first waste water treatment plant in the river basin. Following the flow of the river downstream, the next waste water treatment plant should be therefore located in the city of Kocani.

Ziele

The project will assist the Macedonian authorities in improving the water quality of one of the main rivers in the country while meet the requirements of the national and European legislation for water resource management. The project therefore contributes to the sustainable development of the Kocani region through the protection of its natural resources. This should promote the economic development of the region such as the industrial development, agriculture and tourism.

Mittelfristige Wirkungen

The project will help protect the river Bregalnica from pollution by improving the water quality of the river.

The wastewater will be treated and managed in agreement with the new Macedonian legislation and with European standards.

The Public Utility will be strengthened. Its staff will be trained in order to sustainably operate the treatment plant.

Resultate

Erwartete Resultate:  

Infrastructure Investments

1) Construction of the waste water treatment plant.

2) Construction of a main collector from the city to the location of the waste water treatment plant.

3) Construction of a separate sewage system in Kocani for storm water drainage.

4) Purchase of equipment for operation and maintenance the sewage system.

5) Technical consultancy services during project implementation.

Institutional support and policy dialogue

6) Corporate development measures at the Public Utility "Vodovo".

7) Policy dialogue at national level.


Verantwortliche Direktion/Bundesamt SECO
Kreditbereich Entwicklungszusammenarbeit
Projektpartner Vertragspartner
  • Ausländische staatliche Institutionen


Budget Laufende Phase Schweizer Beitrag CHF    23’375’000 Bereits ausgegebenes Schweizer Budget CHF    0 Budget inklusive Projektpartner CHF    23’375’000
Projektphasen

Phase 1 01.09.2013 - 31.12.2021   (Completed)